Products
-
The Boeing Company: CCPM maturity model
CourseBoeing's CCPM implementations have had modest sustained throughput improvements, despite good initial results. To address the need for better CCPM maturity, this document offers a CMM representation of a CCPM process.
$19
-
Value-based project execution
CourseA novel managerial methodology is proposed to ensure projects deliver true company value, addressing the deficiency where well-managed projects, adhering to scope, time, and budget, fail to yield adequate value.
$19
-
How to dramatically improve Toyota Production System flow line performance - 6 days 60% increase
CourseTo find the CCR in a straight flow line, place a buffer before the station; WIP will pile up in front of it. Placing buffers before and after a CCR can isolate interference, leading to significant capability improvement.
$19
-
From push to pull: Titan Watch Division
CourseTitan Jewelry began a Viable Vision project in Dec 2010 to transition its supply chain from a traditional forecast-based "push" system to a "pull" system to boost availability at its 8,000 selling points.
$19
-
Using TOC to boost a lean organization
CourseTOC (Theory of Constraints) addresses bottlenecks. A 2011 case study in a Mexican auto supplier demonstrated that integrating TOC increased throughput by 17% in 1 hour on a pilot line and over 25% in 2 months across the entire plant.
$19
-
Closing 2012-13 TOCICO chairman of the board
CourseThe conference featured analogies of a German cathedral and aqueduct. These represented the long-term challenge of building knowledge and living a meaningful life by expanding the Theory of Constraints (TOC) beyond business.
$19